Skip to content

Daycare guide · checked October 2026

How to start a daycare in Utah

In Utah, opening a daycare means meeting the rules of the Utah Department of Health and Human Services, Division of Licensing and Background Checks (DLBC), Office of Licensing - Child Care. This guide covers who needs a license, the rules your rooms and staff must meet and the steps to open, with links to the official rules. The Utah rules were checked in October 2026.

Who needs a daycare license in Utah

A child care center license is required to care for 5 or more unrelated children, for pay, away from the provider's or child's home, without the parent present, on an ongoing basis for 4 or more weeks a year (R381-100-3). An out-of-school-time license is required for programs that serve 5 or more children age 5 and older, for pay, 3 or more days a week and 30 or more days a year (R381-70-3). Home-based providers are licensed or certified separately.

Programs that may not need a license: No license is needed for care that is part of a program run by a school regulated by the state or local boards of education, or for care at a public school by an outside organization under contract with the school or with the school's oversight. Also exempt are nonprofit (501(c)(3)) programs for children over 4 and under 13 run under a written agreement with a city or county that oversees them, summer camps on federal land under a federal permit, and short, sporadic care (under 4 hours) with the parent in the building (Utah Code §26B-2-405; R430-8-4). Exempt programs must apply each year to verify their exempt status, post a notice that they are not licensed, and, except school-run programs, submit fingerprint background checks for staff (R430-8-5).

Licensing agency: Utah Department of Health and Human Services, Division of Licensing and Background Checks (DLBC), Office of Licensing - Child Care

Sources: Utah Admin. Code R381-100-10, Ratios and Group Size (LII mirror, amended eff. 5/8/2025); Utah Admin. Code R381-100-3, License Required (LII mirror); Utah Admin. Code R381-70-10, Out-of-School-Time ratios (LII mirror); Utah Code §26B-2-405, Exclusions from child care licensing (Utah Legislature); Utah Admin. Code R430-8-4, Exempt care (LII mirror)

Staff-to-child ratios in Utah centers

AgesChildren per staff memberLargest group
3 years1:1224
4 years1:1530
5 years1:2040
School-age (5 years and older)1:2040

Rule: Utah Admin. Code R381-100-10, Table 1 (child care centers); R381-70-10 (out-of-school-time programs: 1 staff per 20 children, maximum group 40). Utah's center rule puts 5-year-olds in the 'school-age' band (5 and older), so the 5-year and school-age rows are the same. In mixed-age groups without infants or toddlers, the ratio is based on the oldest child's age group minus one child, and the maximum group size on the oldest child's age group minus two children. At least two caregivers must be present when a single group has more than 8 children. Volunteers age 16 and older may count in ratio at centers.

Background checks

Before a new staff member or other covered individual starts, the provider must confirm their eligibility in the licensing provider portal. Anyone not already cleared submits an online application and fingerprints (age 16 and older) for a check by the DHHS Office of Background Processing. The check covers criminal history, the Utah and national sex offender registries, and supported child abuse/neglect findings in the state Licensing Information System (LIS). A new check is required if the person has been away from a licensed program for more than 180 days, has lived outside Utah since the last check, or turns 18. Providers and staff must report any new arrest, charge, or finding within 48 hours (R381-100-8). License-exempt programs, except school-run ones, must also submit these checks (R430-8-5).

Sources: Utah Admin. Code R381-100-8, Background Checks (LII mirror); Utah Admin. Code R430-8-5, Background checks for exempt programs (LII mirror)

Reporting child abuse

Any person who has reason to believe a child is being or has been abused or neglected must immediately report it to the Division of Child and Family Services or the nearest law enforcement agency (Utah Code §80-2-602). Narrow exceptions exist for certain clergy confessions and attorney-client information.

Child abuse hotline: 1-855-323-3237 (1-855-323-DCFS). In an emergency, call 911.

Sources: Utah Code §80-2-602 (Utah Legislature); Utah DCFS: Child Protective Services / Make a report; Child Welfare Information Gateway: Mandatory Reporting of Child Abuse and Neglect

Steps to open a daycare in Utah

1. Choose a daycare center or a home daycare

States license daycare centers and home daycares (often called family child care homes) under different rules, with different limits on how many children you can care for. Decide which one you're starting before anything else.

Utah's license types are described in Who needs a daycare license above. Learn what families near you need, too: your local Child Care Resource and Referral agency (CCR&R) can tell you which ages and hours are hard to find, and our Utah program finder lists licensed centers near you.

2. Contact DLBC

Daycare licensing in Utah is handled by the Utah Department of Health and Human Services, Division of Licensing and Background Checks (DLBC), Office of Licensing - Child Care. Contact it before you sign a lease or buy equipment, and ask, in writing if you can:

  • Which license type fits our plans, and how many children can it cover?
  • Is there an orientation or pre-licensing training, and when is the next one?
  • Which inspections and clearances do we need (licensing, fire, health and zoning)?
  • What does it cost to apply, and how long does approval usually take?
  • What do we need to do to accept families who use childcare assistance?

3. Choose a business structure

A daycare can run as a business (such as an LLC) or as a nonprofit, or under an existing nonprofit such as a church. Talk with an accountant or lawyer before you file anything, and get an employer identification number (EIN) from the IRS. It's free.

4. Find a space that can pass inspection

Check zoning before you sign a lease. Then ask the building department, the fire marshal and DLBC what the space needs, including how much indoor and outdoor space per child Utah requires. Since December 28, 2012, cribs in daycares must meet federal Consumer Product Safety Commission standards.

5. Plan your rooms around the ratios

Utah's ratios for the ages it confirmed are in the table above. They decide how many staff each room needs, so they shape your whole budget. For infants and toddlers, ask DLBC.

6. Hire staff and run background checks

Run the checks in Background checks for daycare staff above before anyone starts.

Federal rules also require comprehensive background checks for staff of every licensed, regulated or registered childcare provider and every provider that can take childcare assistance. Teach every staff member how to report suspected abuse or neglect (see Reporting child abuse above).

7. Get insured

Talk early to an insurance broker who works with childcare programs. Ask about general liability, abuse and molestation coverage, property coverage and workers' compensation, plus auto coverage if you'll transport children. A home daycare should tell its homeowner's or renter's insurer, since those policies may limit business use.

8. Build a budget and set tuition

Start with payroll (see step 5), then add rent, food, supplies and insurance. Compare your numbers with what other daycares near you charge, and set prices for the enrollment you expect, not a full room. Write down your deposit, late payment, late pickup and absence policies before you enroll anyone.

9. Add childcare assistance and the food program

Ask Utah's childcare assistance office how to become an approved provider for families who get help paying for care, and ask about the USDA Child and Adult Care Food Program (CACFP), which reimburses eligible daycares for meals and snacks. Programs that take childcare assistance must meet federal health and safety requirements, including background checks, training and inspections.

10. Prepare your enrollment forms and policies

Ask DLBC which records you must keep for each child. Have your forms ready before you enroll anyone, and collect everything before a child's first day.

Medication in Utah. Parent-supplied medication must be in its original or pharmacy container, with the original label and the child's full name. A signed, dated parent permission form must list the medication, dose, times, how it is given, and the condition being treated. Medication supplied by the center needs parent consent each time it is given. Staff record the date, time, dose, and any error or reaction, and must tell the parent about errors or reactions right away. Medication must be locked or stored out of reach (48 inches up, or 36 inches if refrigerated), and records are kept for 6 weeks (R381-100-17).

11. Fill your spots

Start enrolling before you open, so you aren't paying staff for empty rooms. Tell your CCR&R you're open, check your listing in the state's childcare search once you're licensed, offer tours and keep a waitlist for each age group.

12. Pass your inspections and open

For licensed programs that can take childcare assistance, federal rules require at least one inspection for health, safety and fire standards before licensing, then an unannounced inspection at least once a year. Schedule yours early, train staff on your policies, emergency plan, safe sleep, allergies, medication and pickup rules, and check every child's file before their first day.

Each step is covered in more depth, with examples and sources, in our national guide to starting a daycare.

What we couldn't confirm

Check these points with the state before you rely on them.

  • We found no specific state rule on how often a background check must be renewed (for example, every 5 years). The rule lists only the events that trigger a new check.

Other open points, including camps, are on the Utah rules page.

How BackPR helps

BackPR handles registration, enrollment and health forms, recurring tuition with autopay and check-in against each family's authorized pickup list. Families can register and fill in forms in English or Spanish, and parents get receipts and year-end dependent care statements. It's free for nonprofits, with no subscription and no BackPR fees. Payments run on Stripe, and Stripe's processing fees apply. Other programs get pricing by quote. More on BackPR for childcare.

We researched the Utah rules on this page in October 2026 using AI research tools (Claude, from Anthropic) that read official state rules and federal sources, and a member of our team checked our summaries against those sources. Rules change and have exceptions, so confirm with DLBC before you rely on this page. This is general information, not legal advice. To report an error, email support@backpr.com.

FAQ

Starting a daycare in Utah: questions

Do I need a license to start a daycare in Utah?

A child care center license is required to care for 5 or more unrelated children, for pay, away from the provider's or child's home, without the parent present, on an ongoing basis for 4 or more weeks a year (R381-100-3). An out-of-school-time license is required for programs that serve 5 or more children age 5 and older, for pay, 3 or more days a week and 30 or more days a year (R381-70-3). Home-based providers are licensed or certified separately. Ask DLBC which license type fits your plans.

Who licenses daycares in Utah?

The Utah Department of Health and Human Services, Division of Licensing and Background Checks (DLBC), Office of Licensing - Child Care. Its website: https://dlbc.utah.gov/home/office-of-licensing/child-care/rules/

What are the daycare ratios in Utah?

In licensed centers (Utah Admin. Code R381-100-10, Table 1 (child care centers); R381-70-10 (out-of-school-time programs: 1 staff per 20 children, maximum group 40)): 3 years: 1 adult for every 12 children (groups of up to 24); 4 years: 1 adult for every 15 children (groups of up to 30); 5 years: 1 adult for every 20 children (groups of up to 40); School-age (5 years and older): 1 adult for every 20 children (groups of up to 40).

Open registration
with BackPR

Free for nonprofits. No long-term contract. We set you up and import your data at no cost.